Charlotte asbestos removal
Vinyl-asbestos floor tile, very often in 9-inch squares, and the black cutback mastic used to glue it down are some of the most common asbestos finds in homes and commercial buildings. They usually sit under a later layer of carpet, laminate or vinyl, and they come to light when that layer is pulled up. Intact tile is fairly stable. Breaking, grinding or sanding it is what releases fibres.
Vinyl-asbestos floor tile was a standard floor for kitchens, basements, hallways and classrooms for decades. The 9-inch square is the size most associated with it, but 12-inch tiles and sheet vinyl backing can contain asbestos too. Under the tile there is often a black, tar-like cutback adhesive, which can contain asbestos on its own account. Both usually come to light when someone pulls up the carpet or laminate laid over them years later.
In good condition, floor tile is non-friable: the fibres are locked into vinyl and asphalt, and walking on it does not release much. The risk comes from breaking it, grinding it or sanding it. That is why nobody should run a floor sander or grinder over old tile or mastic, and why a crew taking it up works to keep each tile as whole as possible.
The area is closed off and the floor is kept wet. Tiles are lifted with hand tools, sometimes with gentle heat to soften the adhesive, and placed straight into bags rather than piled. Black mastic left on the slab or subfloor is taken off with a low-odour remover made for the job, not by grinding. The floor is cleaned and checked before new flooring goes down.
Tile and adhesive are separate samples. Floor tile is also one of the materials where the standard microscope method can miss asbestos, so a negative result on tile may warrant a more sensitive lab test before the floor is treated as clean.
If the tile is intact and well bonded, new flooring can often go over it without disturbing it. That leaves the tile in place for the next owner, but it avoids removal altogether, which is the right call for many floors.
How long does it take? A kitchen or basement floor is usually a day or two, depending on area, how well the tile is bonded and how much mastic has to come off the slab or subfloor.
These often turn up in the same house, or the same remodel:
Samples of each suspect material sent to a lab, with a written result for each one before any work is planned. Includes surveys ahead of a renovation or demolition.
Read more →Textured ceilings that test positive are wetted, scraped and bagged inside sealed containment, and the ceiling is left ready for finishing.
Read more →Wrap on old heating pipes, boilers and duct joints removed before an HVAC change-out, often by glovebag so the room stays in use.
Read more →Free to ask
Don't sand, scrape or drill it. A quick description is enough to start.
We will call to talk through what you have found. To talk sooner, call (704) 327-3475
Something went wrong sending your request. Please call (704) 327-3475 and we’ll take the details over the phone. Your answers are still filled in below if you’d rather try again.